List of Commissioned IPPs (Non-Operational)
(As on 13 March 2025)
Sr. # |
Project Name |
Location |
Fuel / Technology |
Gross/ Installed Capacity |
Residual Furnace Oil (RFO) |
||||
1 |
Hub Power Project, (HUBCO) * |
Tehsil Hub, District Lasbela, Balochistan |
RFO |
1,292 |
2 |
Lalpir Power Project |
Mehmood Kot, Muzaffargarh |
RFO |
362 |
3 |
Pak Gen Power Project |
Mehmood Kot, Muzaffargarh |
RFO |
365 |
4 |
Gul Ahmed Energy Project |
Korangi Industrial Township, Karachi |
RFO |
136 |
5 |
Japan Power Generation Project |
17 km Jia Bagga, Off Raiwind Road, Lahore |
RFO |
120 |
6 |
Saba Power Project |
Farouqabad, Shiekhupura |
RFO |
134 |
7 |
Southern Electric Power Project |
Raiwind Lahore |
RFO |
117 |
8 |
Tapal Energy Project |
District West, Karachi |
RFO |
126 |
9 |
Atlas Power Project |
Sheikhupura |
RFO |
225 |
Sub-Total (RFO) |
2,877 |
|||
Gas/RLNG |
||||
10 |
Habibullah Coastal Power Project |
Quetta |
Gas/RLNG* |
140 |
11 |
Rousch (Pakistan) Power Project*** |
Abdul Hakeem Barrage, District Khanewal |
Gas/RLNG* |
450 |
12 |
Davis Energen Private Ltd |
Jhang, Punjab |
Gas/RLNG* |
10.5 |
13 |
Altern Power Project |
Fateh Jang, Attock |
Gas/RLNG* |
31 |
Sub-Total (Gas/RLNG) |
631.50 |
|||
Multi-Fuels |
||||
14 |
Kot Addu Power Project (KAPCO)**** |
Kot Addu District, Muzaffargarh |
Gas/RFO/Diesel/ RLNG* |
1,638 |
Sub-Total (Multi-Fuels |
1,638 |
|||
Grand Total (RFO+Gas/RLNG+Multi-Fuels based IPPs) |
5,146.50 |
* Processed prior to 1994 Power Policy
** IPPs developed on indigenous gas but later allocated RLNG
*** IPP developed on RFO but later converted on Gas
****Initially KAPCO was a Public-Sector Power Project; however, through its strategic sale by the Privatization Commission, it was converted into IPP