List of Commissioned IPPs (Non-Operational)
(As on 13 March 2025)

Sr. #

Project Name

Location

Fuel / Technology

Gross/

Installed Capacity
(MW)

Residual Furnace Oil (RFO)

1

Hub Power Project, (HUBCO) *

Tehsil Hub, District Lasbela, Balochistan

RFO

1,292

2

Lalpir Power Project

Mehmood Kot, Muzaffargarh

RFO

362

3

Pak Gen Power Project

Mehmood Kot, Muzaffargarh

RFO

365

4

Gul Ahmed Energy Project

Korangi Industrial Township, Karachi

RFO

136

5

Japan Power Generation Project

17 km Jia Bagga, Off Raiwind Road, Lahore

RFO

120

6

Saba Power Project

Farouqabad, Shiekhupura

RFO

134

7

Southern Electric Power Project

Raiwind Lahore

RFO

117

8

Tapal Energy Project

District West,  Karachi

RFO

126

9

Atlas Power Project

Sheikhupura

RFO

225

Sub-Total (RFO)

2,877

Gas/RLNG

10

Habibullah Coastal Power Project

Quetta

Gas/RLNG*

140

11

Rousch (Pakistan) Power Project***

Abdul Hakeem Barrage, District Khanewal

Gas/RLNG*

450

12

Davis Energen Private Ltd

Jhang, Punjab

Gas/RLNG*

10.5

13

Altern Power Project

Fateh Jang, Attock

Gas/RLNG*

31

Sub-Total (Gas/RLNG)

631.50

Multi-Fuels

14

Kot Addu Power Project (KAPCO)****

Kot Addu District, Muzaffargarh

Gas/RFO/Diesel/ RLNG*

1,638

Sub-Total (Multi-Fuels

1,638

Grand Total (RFO+Gas/RLNG+Multi-Fuels based IPPs)

5,146.50

* Processed prior to 1994 Power Policy

** IPPs developed on indigenous gas but later allocated RLNG

*** IPP developed on RFO but later converted on Gas

****Initially KAPCO was a Public-Sector Power Project; however, through its strategic sale by the Privatization Commission, it was converted into IPP