S#

Project Name

Gross / Installed Capacity (MW)

Net / Dependable Capacity (MW)

 PRIOR TO 1994 POWER POLICY

1

Hub Power Project

1292

1200

UNDER 1994 POWER POLICY

2

Lalpir Limited

362

350

3

Pak Gen.  (Pvt)  Limited

365

350

4

Altern Energy Limited

29

29

5

Fauji Kabirwala Power Company

157

151

6

Gul Ahmed Energy Ltd. (GAEL)

136

125

7

Habibullah Coastal Power (Pvt) Co.

140

126

8

Japan Power Generation (Pvt) Limited

135

120

9

Kohinoor Energy Limited

131

126

10

Liberty Power Project

235

211

11

Rousch (Pakistan) Power Limited

450

395

12

Saba Power Company Limited

125

125

13

Southern Electric Power Company Limited

136

119

14

Tapal Energy Limited

126

120

15

Uch Power Limited

586

551

16

Davis Energen Power Project

10

10

UNDER 2002 POWER POLICY

17

Attock Gen Limited

165

156

18

Atlas Power Limited

225

214

19

Engro Energy Limited

227

217

20 Foundation Power Company (Daharki) Limited 185 177
21 Halmore Power Generation Company Limited 225 209
22 Hub Power Project - Narowal 220 214
23 Liberty Power Tech 200 196

24

Nishat Power Limited

200

195

25

Nishat Chunian Limited

200

195

26

Orient Power Company Limited

229

213

27

Saif Power Limited

229

209

28

Sapphire Electric Company Limited

225

212

29

Uch-II Power Project

404

375

TOTAL

7349

6890

30  Kot Addu Power Company Limited (KAPCO)
Note: Initially KAPCO was a Public-Sector Power Project; however, through its strategic sale by the Privatization Commission, it was converted into IPP through privatization.
1638 1386
Grand Total 8987 MW 8276 MW
 
     
     
 

 

 
 